Designing Leaner Temporary Works

Designing Leaner Temporary Works - 21/01/19

Welcome back to Tony’s Technical Blog

It’s certainly been a while, a year to be exact since my last post, where has the time gone?

Anyway, to get back in the saddle so to speak, I thought I would reproduce a 5-minute “Viewpoint” article that I presented back at last October’s GE Basement Conference. As long term sponsors of this event, we are entitled to plan out one of the themed breakout sessions. The theme we settled on was "Designing Leaner Temporary Works".  To start the session we had three 5-min viewpoint presentations; contractor, consultant and supplier i.e.me, on how this could be achieved. This was how I see it from a designer/supplier’s perspective.

Tony Gould

Latest Articles

View all...
Groundforce helps to speed up construction operations at Gothenburg hospital

Groundforce helps to speed up construction operations at Gothenburg hospital - 14/02/25

Groundforce equipment has created critical time and cost savings on a challenging project on a...

Groundforce Shorco provides bespoke support to complex excavation

Groundforce Shorco provides bespoke support to complex excavation - 14/02/25

Groundforce Shorco has provided specialist shoring equipment and design services for a complex...