Heavy Duty Pile Cropper Hire
The Heavy Duty Circular Pile Cropper is suitable for cutting piles from 1200mm to 2100mm. The cropper is a pinned modular design which offers maximum flexibility allowing it to be adjusted to suit different pile sizes on site. The Heavy Duty Cropper reduces cropping time from 2 hours to 10 minutes on an average 1200mm circular concrete pile compared with using hammers and breakers.
- An efficient and time-saving system used for cropping large, cast in-situ concrete piles
- Maximum flexibility allows adjustments to suit many pile sizes